Project : | FACULTY OF ENGINEERING – CHINESE UNIVERSITY | |
Location : | Cairo, Egypt (Under Construction) | |
Owner : | Chinese University of Egypt | |
Client : | Progress Consulting Group | |
Description : | The project is the faculty of engineering of the newly established Chinese University in Egypt. The project is located at Cairo with a total land area of 25000m2 & built up area around 20000m2. The project consists of the following buildings: | |
1- | Main hall building with 2 main halls for lectures. | |
2- | Administration building with 3 floors. | |
3- | Teaching classes building with 3 floors. | |
4- | Laboratory & workshop building with 3 floors. | |
5- | Students affairs building with 3 floors. | |
6- | Substation, Mosque, & canteen & other related service buildings. | |
The total connected power is around 5 MVA. | ||
Scope of work: | Design for phase 3 buildings & related site networks for all MEP installations in building & site.